Posts - Page 8 of 10
18 March 22 - Gametogenesis and Heatwave Research
18 March 2022
17 March 22 - Gametogenesis and Heatwave Research
17 March 2022
16 March 22 - Gametogenesis and Heatwave Research
16 March 2022
15 March 22 - Gametogenesis and Heatwave Research
15 March 2022
14 March 22 - Gametogenesis and Heatwave Research
Tank Updates
Danielle and MVP Gump employee, Tony, have been working on getting a chiller system set-up for the water tables at Gump and today was the day! Using Hollies idea for a vanne à flotteur system where the water can be cooled and used but will always stay above a certain level to not damage the pumps or the chiller. This set-up will be a great addition to control ambient temperature levels for the planned tank system.
13 March 22 - Gametogenesis and Heatwave Research
Tank Updates
Danielle assigned the remaining 6 Apex temperature probes to their respective Apex PM1 units to prep them for setting up during the heatwave. She also made all the settings and outlet updates for the second Apex Controller System to follow her planned ramping of temperatures. All of the outlets are linked to the Putnam Lab Apex fusion account to be able to set planned diel temperatures each day. Danielle also began breaking down the 6 large tanks she had set-up for preliminery testing.